QTPA Member Alert |ABS Construction Work Done, Australia, Preliminary, Mar 2014

ABS Construction Work Done, Australia, Preliminary, Mar 2014  

MARCH 2014 KEY FIGURES

 

Mar qtr 14

$m

Dec qtr 13 to Mar qtr 14

% change

Mar qtr 13 to Mar qtr 14

% change

TREND ESTIMATES (a)

Value of work done

Building

21 587.4

1.4

4.6

Residential

12 781.1

2.4

5.0

Non-residential

8 802.9

3.0

Engineering

32 192.9

-0.5

0.1

Total construction

53 781.3

0.2

1.9

SEASONALLY ADJUSTED ESTIMATES (a)

Value of work done

Building

21 766.9

3.3

6.2

Residential

13 054.9

6.8

8.4

Non-residential

8 712.1

-1.5

3.1

Engineering

31 854.2

-1.6

0.2

Total construction

53 621.1

0.3

2.6

-nil or rounded to zero (including null cells)

(a) reference year for Chain Volume Measures is 2011-12

MARCH 2014 KEY POINTS

VALUE OF WORK DONE:
TOTAL CONSTRUCTION

  • The trend estimate for total construction work done rose 0.2% in the March quarter 2014.
  • The seasonally adjusted estimate for total construction work done rose 0.3% to $53,621.1m in the March quarter.

BUILDING WORK DONE

  • The trend estimate for total building work done rose 1.4% in the March quarter.
  • The trend estimate for non-residential building work done remained unchanged in the March quarter while residential building work rose 2.4%.
  • The seasonally adjusted estimate of total building work done rose 3.3% to $21,766.9m in the March quarter.

ENGINEERING WORK DONE

  • The trend estimate for engineering work done fell 0.5% in the March quarter.
  • The seasonally adjusted estimate for engineering work done fell 1.6% to $31,854.2m in the March quarter.